 |
|
 |
|
|
|
|
|
|
|
|
|
|
|
Subscribe for updates to this project to be sent
to your email.
|
|
 |
|
 |
Replace existing bridge located over the New York Canal and build to four lanes. New bridge will be striped to include two vehicular lanes, with bike lanes and pedestrian facilities on both sides. The project also includes construction of curb, gutter and sidewalk between the bridge and McGlochlin Street.
Start Date: Summer 2005
End Date: Summer 2006
The Bridge will be down to one lane at times