Cole Road Bridge #350

General Description

Replace existing bridge located over the New York Canal and build to four lanes. New bridge will be striped to include two vehicular lanes, with bike lanes and pedestrian facilities on both sides. The project also includes construction of curb, gutter and sidewalk between the bridge and McGlochlin Street.

Time Frame

Start Date: Summer 2005
End Date: Summer 2006

Impact on your Commute

The Bridge will be down to one lane at times