Projects
PROJECT ARCHIVE
Bridges
Capitol Boulevard Bridge
Cole Road Bridge #350
East ParkCenter Bridge
Lake Hazel Bridge #304 (2010)
West ParkCenter Bridge - Completed
Roadways
2008 Local Overlay Projects
2009 Local Overlay Projects
42nd Street, Chinden Blvd. (US20/26) to Adams St.
Atlantic Street - Atlantic Place to Morris Hill Road - Completed
Cartwright Road Reconstruction
Cole Road - Victory Road to I-84 On-Ramp
Deer Flat Road, Meridian Road (SH-69) to Ten Mile Road (2010)
El Caballo Drive - Cole Road to 400' east of Cole Road
Federal Way
Five Mile Extension
Floating Feather Rd., Eagle Rd. to Edgewood Ln.
Heron Street, 13th Street to 9th Street
Highland Street - Broadway Avenue to ParkCenter Boulevard
Maple Grove Extension - McMillan Road to Chinden
Maple Grove Road, Franklin Road to Fairview Avenue
Meridian Road & Main Street Split Corridor, Phase 1
Overland Road - East of Hwy 69 to East of Eagle Road
Overland Road - Topaz Ave/Cloverdale Road
Overland Road, Topaz Avenue to Cloverdale Road
Pine Avenue Extension -- Developer Cooperative Project
Shaw Mountain Road Slope Stabilization
Ustick Road -- Five Mile Road to Cole Road & Maple Grove
Intersections
3rd and Myrtle Signalization Project
Fairview Cloverdale Intersection
Fairview Avenue Rehabilitation & Intersection Reconstruction
McMillan Road and Red Horse Way Signalization
McMillan/Linder & McMillan/Ten Mile Intersection Improvements
Orchard Street/Franklin Road Intersection
Overland & Meridian Road (SH69)
SH 69 (Meridian Rd.) and Columbia Rd.
Ustick Road & Linder Road Intersection
Community Programs
Community Programs projects can include sidewalk repair, curb and gutter repair, traffic calming and/or drainage improvements and may include rebuilding the roadway
32nd Street, Grace Street to Dewey Street (east side)
4th Street, School Avenue to Linder Road
Cloverdale Rd., Briarwood Dr. to Ustick Rd.
Eugene Street
Floating Feather & Thunderbird and Floating Feather & Sevenoaks Pedestrian Improvements
Hill Road, 13th Street to 15th Street (south side)
Leadville Avenue, Boise Avenue to Williams Street
Lewis Street, Elm Avenue to Walnut Street
Madison Avenue and 27th Street (2010)
Malad Street, Kerr Street to Shoshone Street (2010)
River Street, Americana Boulevard to Interfaith Sanctuary (2010)
Studies
Floating Feather Realignment
Kuna-Mora Road Corridor Study, Phase I
Lake Hazel Extension/Gowen Road Relocation Study
Northwest Foothills Transportation Study
Purple Sage/Beacon Light Alignment Study
South Meridian Transportation Plan
Southwest Boise Transportation Study - Eagle - Cloverdale Alignment